Evershine Engineering installs the electrical, ELV, fire-alarm and life-safety systems behind Dubai's residential towers — first fix to final handover, floor by floor, on a programme you can plan around.
Every project gets the same integrated scope — installed by crews who move between systems instead of handing off between subcontractors.
Power, lighting, wiring, containment, DBs and SMDBs — from first fix through energization.
Low-current containment, cabling and devices, coordinated with MEP and architectural finishes.
Conduits, fire-rated cabling, detectors, sounders, call points, modules, panels and interfaces.
Emergency luminaires, exit signs, local circuits and central-battery connections where applicable.
Data and telephone cabling, outlets, racks and patch panels — structured, labelled and dressed.
Readers, door contacts, exit buttons, break-glass units, locking hardware and controllers.
Switchgear, panels, containment and terminations — installed and commissioned by our own crews.
33/11kV Switching Station
Switchgear Room
Fire Alarm Control Panel
DB Termination
Transformer Installation
Cable Trenching
Plant Room Wiring
LV Switchgear RoomThree stages, tracked floor by floor, so the main contractor always knows where a unit stands.
Setting out to approved drawings. Conduits, back boxes, cable trays and containment installed for every system before walls and ceilings close.
Cables pulled and dressed. DBs, SMDBs, switches and sockets installed. Fire-alarm, telecom and access-control field devices fitted.
Testing, DB schedules and permanent labelling. Snag rectification and handover support through commissioning and authority inspection.
Evershine Engineering's installation teams move across sectors — the same first-fix-to-final-fix discipline, whichever building type it's for.
Dubai Festival City, Dubai
ICAD 2, Abu Dhabi
Meraas, Dubai Creek
Al Qusais, Dubai
Every installation follows DEWA wiring regulations and the UAE Fire and Life Safety Code — not as an add-on, but as the baseline scope.
10% mobilization advance, monthly certified progress payments, 5% retention released at completion and after the defects-liability period.
Installation quality is warranted for 12 months from practical completion — separate from equipment manufacturer warranties.
No liquidated damages built into our offers. Delay risk is allocated to whoever caused it — not assumed by default.
Send over the scope, unit count and floor range, and we'll come back with a labour-only installation offer built the same way as the one on your desk right now.